Skip to content
Printer-friendly version

School Facilities Fingertip Facts

See also School Facility

  1. Public K-12 Projected Enrollment 2007-12 (5 years) See also:
    California Public K-12 Enrollment and High school Graduate Projection by County - 2007 Series
    (XLS; Outside Source)
    (Department of Finance Demographic Unit)
    Based on Department of Finance October 2007 estimates of graded enrollment
Grade Level
2007-08
2012-13

Five Year Change

Change Per Year
K-6
3,269,393
3,356,656
87,263
17,453
7-8
976,081
919,320
-56,761
-11,352
9-12
1,997,542
1,902,995
-94,547
-18,909
TOTAL
6,243,016
6,178,971
-64,045
-12,808
  1. Statewide New Construction and Modernization Classroom Need
    Based on eligibility documents on file with the Office of Public School Construction (OPSC) as of September 26, 2007 and projects for which only a design apportionment has been made, the five-year need for new classrooms and the modernization of existing classrooms is:

    New Construction Five-Year Need
    Grade
    Level
    Projected
    unhoused
    students
    Classrooms
    needed
    2007-2012*
    Classrooms
    needed
    per year
    Classrooms
    needed
    per day
    K-6
    308,024
    12,321
    2,464
    7
    7-8
    87,705
    3,248
    650
    2
    9-12
    268,402
    13,645
    2,729
    7
    TOTAL
    664,131
    29,214
    5,843
    16

Modernization Five-Year Need

Grade
Level
Students in
classrooms
over 25
years old
Classrooms
to be
modernized
2007-2012*
Classrooms to be
modernized
per year
Classrooms to
be modernized
per day
K-6
507,070
20,283
4,057
11
7-8
190,248
7,046
1,409
4
9-12
305,948
11,331
2,266
6
TOTAL
1,003,266
38,660
7,732
21

*Based on 25 students per K-6 classroom and 27 students per 7-12 classroom.

  1. Statewide New Construction and Modernization Funding Need
    The state share of funding, including district financial hardship costs, for approved but unfunded projects and for projects for which eligibility documents have been filed with the Office of Public School Construction as of September 26, 2007 is:
State Share 5 Year Need Per Year
New Construction (50% state share) $ 8.7 billion $1.74 billion
Modernization (60% state share) $ 3.5 billion $0.7 billion
TOTAL (Rounded) $12.2 billion $2.44 billion
  1. State K-12 General Obligation Bond History
Year Dollars
1982 $500 M
1984 $450 M
1986 $800 M
1988 (June) $800 M
1988 (Nov.) $800 M
1990 (June) $800 M
1990 (Nov.) $800 M
1992 (June) $1.9 B
1992 (Nov.) $900 M
1994 (June) $1.0 B (failed by 0.4%)
1996 (March) $2.03 B
1998 (Nov.) $6.7 B (for 4 years)
2002 (Nov.) $11.4 B
2004 (March) $10.0 B
2006 (Nov.) $7.33 B

Million (M); Billion (B)

  1. Public School Data 2006-07. See also: Dataquest and Student Demographics.
Number of Districts 1,052

Number Type of District
560 Elementary Districts
330 Unified Districts
87 High School Districts
75 County Offices, California Youth Authority, and State Special Schools

 

Number of Public Schools 9,674

Number Type of School
5,714 Elementary Schools
1,289 Middle/Jr. High Schools
1,182 High School Schools
1,489 Continuation (Cont.), Alternative (Alt.), etc.

Number of Classrooms: 299,503 Classrooms over 25 years old: 215,642 (72%)
Number of
Charter Schools:
584 Charter School Enrollment 222,266 (3.53% of K-12 enrollment)
  1. Year-Round Education (YRE) 2006-07. See also Multitrack Year-Round Education
    140 districts use YRE. 64 districts use Multitrack (MTYRE) and 104 use Single Track (STYRE) (some districts use both calendars)
Calendar Elementary MTYRE Elementary STYRE Middle MTYRE Middle STYRE High School MTYRE High School STYRE Cont. High, Alt., etc. MTYRE Cont. High, Alt., etc. STYRE Total MTYRE Total STYRE
Schools 496 502 40 87 25 69 17 53 578 711
Enrollment 411,344 295,229 68,901 71,767 75,522 51,416 14,202 12,344 569,969 430,756

Two districts use the MTYRE Concept 6 calendar: Los Angeles Unified and Lodi Unified. Of the MTYRE data cited above, Concept 6 consists of:

  Elementary Middle High Cont. High, Alt., etc. TOTAL
Schools 27 13 16 2 58
Enrollment 24,482 33,565 64,167 6,191 128,405
  1. Basic Construction Data
    These are average costs based on the allowances provided in the State's School Facility Program as presented in the OPSC's September 26, 2007 version of "School Facility Program Statistical and Fiscal Data." Local costs may vary due to district educational program needs and the local building economy.
  Construction Cost per Student* Students per School Construction Cost per School Square Feet per Student School Site Size (Acres)** Cost per Square Foot Land Cost at 25% of Construction Cost Total Cost
Elementary $15,797 600 $9,478,200 71 9.6 $222 $2,369,550 $11,847,750
Middle $16,966 1,000 $16,968,000 85 21.9 $200 $4,242,000 $21,210,000
High $20,603 1,800 $37,085,400 92 44.5 $224 $9,271,350 $46,356,750

*Cost based on twice the state share (as of September 26, 2007) provided in the "School Facility Program." Includes design fees, furniture, equipment, and construction.

**Based on the number of students per school and the guidelines in "School Site Analysis and Development," California Department of Education, 2000 Edition.

Questions:  Shannon Farrell-Hart | sfarrell@cde.ca.gov | 916-323-3923
Download Free Readers