Skip to main content
California Department of Education Logo

2003–04 School PI Status Record Layout

Data file record layout of Title I schools' Program Improvement (PI) status based on Adequate Yearly Progress (AYP).

Field Name
cds Char
County/District/School code
cname Char
County name
dname Char
District name
sname Char
School name
d_f_c Char
Direct-funded charter school indicator
base_yr Char
Baseline year indicator. The year when school was identified as Program Improvement (PI)
targ_ast Char
Targeted assistance school (TAS) indicator
AYP_0102 Char
Made AYP in 2001–2002 indicator. For a Targeted Assistance School this indicates whether the socioeconomically disadvantaged subgroup has met Adequate Yearly Progress (AYP). It does not indicate whether the school has met AYP as a whole. A blank in this field indicates that these data were not necessary to determine PI status for 2003–04 or school was not Title I in 2001–02.
AYP_0203 Char
Made AYP in 2002–2003 Phase III indicator. "No*" in this field indicates that although the school failed to make AYP in both years, the school was not identified for Program Improvement because it did not fail the same content area two years in a row. "No*" also indicates that the school did not meet their Academic Performance Index (API) or graduation rate in Phase III.
PI_place Char
The PI school's placement under No Child Left Behind (NCLB) for 2003–2004. Shown as Year 1, Year 2, Year 3, or Year 4
PI_exit Char
The year a school exited from PI status
Questions: PI Accountability Team | | 916-319-0869 
Last Reviewed: Monday, October 19, 2015

Share this Page

Recently Posted in Accountability

  • Parent Guide to the 2015 APR System (PDF) (added 12-Nov-2015)
    A summary of California's 2015 Accountability Progress Reporting (APR) System designed for parents and guardians.
  • Demographic Data:2014-15 TITLE3 Accountability Rpt (added 10-Nov-2015)
    Notification: source of demographic data used for the 2014-15 Title III Accountability Reports and the California English Language Development Test (CELDT) Reports and timeline for making demographic data corrections.
  • Preliminary 2014-15 Title III Accountability Data (added 10-Nov-2015)
    Preliminary 2014–15 Title III Accountability data posted to the CDE Web site includes the number and percentage of students who met annual measurable achievement objectives (AMAOs) 1 and 2.
  • Important Info 2014-15 Title 3 Accountability Rpts (added 10-Nov-2015)
    Information on waiver submitted by CDE to the U.S.ED permitting certain LEAs receiving Title III subgrants to continue its implementation of same requirements in 2015-16 previously used in the 2014-15 school year.
  • APR Release Date (added 10-Nov-2015)
    Information on the estimated release date for the 2015 AYP and PI Reports.