Fiscal Year 2023-24 June Year-End Reporting Reminders
<begin add> This letter is being revised to update the Fiscal Year (FY) 2023–24 audit submission website link. For ease in determining what has been revised from the previous letter dated July 16, 2024, the new link can be seen with difference marking around the additions that reads <begin add> and <end add>. <end add>
The purpose of this letter is to compile reporting information provided throughout FY 2023–24 and to provide contractors the due dates and reporting requirements for purposes of completing June year-end and audit reports for the fiscal year ending June 30, 2024. Please share this letter with your agency staff. A subsequent letter will be issued by the Early Education and Nutrition Fiscal Services (EENFS) unit in the coming weeks to inform contractors of any changes to California State Preschool Program (CSPP) contracts and reporting procedures for FY 2024–25.
Contracts and Contract Amendments
Any outstanding original contracts and contract amendments requiring signature for FY 2023–24 must be signed and returned to the California Department of Education (CDE) Contracts Office as soon as possible. The CDE cannot make payments based on amended terms until amendments requiring signature have been signed and returned.
As a reminder, due to the Allocation Letter process implemented in FY 2021–22, most original contracts and amendments do not require a signature. Contractors unsure whether an amendment requires a signature should contact the CDE’s Contracts Office at EarlyEducationContracts@cde.ca.gov.
Fiscal Year 2023–24 June Year-End Reports Reporting Deadline
FY 2023–24 June Year-End Enrollment, Attendance, and Fiscal Reports are due by July 22, 2024. All reports must be submitted online through the California Preschool Accounting Reporting Information System (CPARIS). Acceptable reports not certified by July 22, 2024, will be considered delinquent. Pursuant to California Code of Regulations, Title 5 (5 CCR) Section 17814, a delinquent report results in withholding any remaining apportionments due for FY 2023–24. Additionally, apportionments for FY 2024–25, beyond the initial payment, will be withheld until the contractor has complied with this contract requirement.
CPARIS can be found on CDE’s website at https://cparis.cde.ca.gov/cparis/logon.aspx. The CPARIS User Manual, which provides CSPP contractors with instructions on how to navigate the web-based application, can be found at https://www.cde.ca.gov/fg/aa/cd/documents/cparisusermanual23.docx. A recording of the CPARIS webinar held in January 2023, during which a system overview, the process to certify and revise previously certified reports, and a review of the CSPP contract earnings calculation was discussed, can be found at https://www.cde.ca.gov/fg/aa/cd/cpariswebinar.asp.
Fiscal Year 2023-24 Enrollment, Attendance, and Fiscal Reporting
Fiscal Year 2023–24 California State Preschool Program Hold Harmless for Enrollment and Attendance
Education Code (EC) Section 8245.5(c), specifies that for FY 2023–24, CSPP contractors that remain open and operating in accordance with their approved program calendar, and remain open and offering services through the program year, shall be reimbursed for an audited claim that is the least of the following:
- One hundred percent of the maximum reimbursable amount as stated in the annual preschool contract; or
- The net reimbursable program costs.
Reporting Family Fees
Assembly Bill (AB) 110 waived family fees for all families enrolled in a CSPP from July 1, 2023, through September 30, 2023. Although family fees were waived for the first quarter of FY 2023–24, contractors were still required to assess the appropriate family fee.
After September 30, 2023, family fees are no longer waived. AB 116 requires that no family fees be charged or assessed for families whose adjusted monthly family income falls below 75 percent of the State Median Income (SMI), and further caps family fees at 1 percent of a family’s monthly income for all other families. As a result, the FY 2023–24 family fee schedule has been revised accordingly and can be found at https://www.cde.ca.gov/sp/cd/ci/documents/fy2324famfeeschedule.xlsx.
Contractors must report all assessed family fees on the appropriate line of the Enrollment, Attendance, and Fiscal Report in CPARIS. All contractors must report the total family fees assessed but waived on the line Waived Family Fees for Certified Children (July – September). Family fees assessed between October 1, 2023, and June 30, 2024, must be reported on the line Family Fees for Certified Children (October – June).
Family fees reported on the line Family Fees for Certified Children (October – June) must be based on the amount the contractor expects to collect in the report month, regardless of when the revenue is received.
For additional details, please refer to MB 23-07, which can be found here: https://www.cde.ca.gov/sp/cd/ci/mb2307.asp.
Allocations Paid Outside of the CSPP Contract
In FY 2023-24, the CDE issued additional funding intended to support CSPP contractors for providing preschool services to subsidized children. Because these funds are considered one-time or temporary, the CDE has allocated the various funds outside of a contractor's CSPP contract. Eligible CSPP contractors were sent notification emails from their fiscal analyst as allocations were released to contractors. The allocations issued in FY 2023-24 were:
- Cost of Care Plus Rates
- Senate Bill 140 Transitional Payments for Providers and CSPP Centers
- Temporary Rate Increases
Some of these allocations require that contractors distribute funds to family childcare providers and subcontractors. Contractors required to distribute funds to family child care providers should report payments on the line Direct Payments to Providers: FCCH Only in CPARIS. Contractors who are required to distribute funds to subcontractors should report payments on the line Direct Payments to Subcontractors: Cost of Care Plus & One-Time Allocations Only in CPARIS.
The funds from these various allocations are considered restricted income. Allocations funded by the American Rescue Plan Act (ARPA) shall be reported on the line Restricted Income: American Rescue Plan Act (ARPA) in CPARIS. Allocations funded by the State General Fund or Proposition 98 shall be reported on the line Restricted Income: Other in CPARIS. For more information on how to report the revenue and expenses, please refer to the Reporting Revenue and Expenses section of this letter below.
For additional information on the different allocations, please refer to the Allocations Paid Outside of the CSPP Contract FAQs, which can be found at https://www.cde.ca.gov/fg/aa/cd/allocationsfaq.asp .
Reporting Revenue and Expenses
Contractors must follow Generally Accepted Accounting Principles (GAAP) for accrual accounting and shall follow the accounting procedures specified in the most recent edition of the California School Accounting Manual (CSAM). The CSAM specifies that under an accrual basis of accounting, revenues are recorded when earned and expenditures are recorded when a liability is incurred, regardless of when the receipt or payment of cash takes place.
Contractors are reminded that reporting revenue is dependent on the source of the income and how it is expended. Revenue should only be reported when its corresponding expenses are also reported. Restricted revenue reported in the Restricted Income categories in the Enrollment, Attendance, and Fiscal Report is income provided for a specific, limited purpose and that can only be expended for certified children (5 CCR Section 17700).
Additionally, if contractors earned government funding, such as Paycheck Protection Program or Employee Retention Tax Credit funding, related to expenses claimed as reimbursable to a contract, that revenue is considered program revenue, and the funds must be reported as restricted income. It is important to ensure all restricted income is correctly reported throughout the year. Restricted income that is not reported until a contractor’s audit could result in a large, unexpected billing.
When determining whether an expense may be charged to the contract, contractors should follow GAAP. This guidance includes situations where a contractor prepays for supplies or equipment in one contract year and does not receive those supplies or equipment until the following contract year. Per 5 CCR, Sections 18037 and 18063, except for audit costs, expenses considered incurred in a future year per GAAP are not reimbursable under the current year contract.
For additional details, please refer to the CSAM, which can be found at https://www.cde.ca.gov/fg/ac/sa/.
Reporting the Prior Year Exceptional Needs Set Aside Deferred Revenue
Pursuant to EC Section 8208(c)(1), beginning FY 2022–23, CSPP contractors are required to set aside five percent of funded enrollment for children with exceptional needs, including those that are severely disabled, as defined in EC Section 8205. In FY 2022–23, contractors were fully funded for the percentage of funded enrollment set aside amounts, pursuant to EC Section 8208(c)(2)(B), to ensure that funding was available to enroll children with exceptional needs within the required set aside. The CDE provided 100 percent of the set aside funding to contractors, regardless of the extent to which the required set aside was met through providing services to exceptional needs and severely disabled children.
Contractors that did not fully earn the FY 2022–23 set aside received additional revenue from their CSPP contract that otherwise would not have been received. The CDE did not invoice CSPP contractors for any unused set aside funds from FY 2022–23. Instead, these funds are considered deferred revenue and must be reported in the Enrollment, Attendance, and Fiscal Reports as restricted income on the line Restricted Income: Otherline. As with all other revenue, these funds should only be reported when the associated expenditures are also reported.
Reporting Start-up Allowance
Contractors with a FY 2023–24 CSPP contract containing approved start-up associated with expansion funding must report any expenses associated with the start-up allowance on the Start-up Expenses line in CPARIS. Start-up expenses should be reported only on the Start-up Expenses line, and not included in the expenses reported in categories 1000-6500.
Allowable start-up expenses are negotiated and approved by the CDE and are specific to each contract. Expenses reported on the start-up line must only include what was requested by the contractor and approved by the CDE.
Reporting Staff Training Costs
EC Section 8251 allows contractors to schedule up to two days of staff training, per contract period, using state reimbursement funding on the topics including procedures for emergencies in preschool programs, licensing regulations relating to preschool programs, recognition and reporting of suspected abuse of children in preschool programs, managing challenging behaviors and preventing expulsion of children, and addressing items on the program’s Quality Rating and Improvement System (QRIS) Quality plan. While staff training days have always been a reimbursable expense, EC Section 8251 allows the CDE to reimburse expenses associated with professional development without requiring contractors to meet the service requirement for their contract.
Contractors remaining open during training should report the expenses associated with the training in the appropriate expense category but should not report those expenses on the Total Staff Training Cost line.
Contractors that do not provide services to certified children on staff training days should report the expenses associated with the training in the appropriate expense category. In addition, they must report those expenses on the Total Staff Training Cost line.
Reporting Quality Rating and Improvement System
The QRIS is a local level block grant with a focus on improving program quality. It was created to meet the needs of early learners and ensure access to high quality programs for California’s children. The primary purpose of this funding includes training, professional development days, stipends, and bonuses. Contractors are reminded that income and expenses associated with the use of these funds must be reported on the Enrollment, Attendance, and Fiscal Report. In most cases, these grant funds should be reported as supplemental revenue and expenses.
Reporting Reminders for the Prekindergarten and Family Literacy Support Contract
The Prekindergarten and Family Literacy Support (CPKS) contract is a support contract that also requires that a June year-end fiscal report be certified by the July 22, 2024, deadline. CSPP contractors who hold a CPKS contract must submit their June year-end fiscal report in CPARIS, even if the contractor fully expended and reported the full contract amount prior to the end of the year.
Revised June Year-End Reports
June year-end reports must be certified by the deadline of July 22, 2024, to avoid becoming delinquent. However, revisions to year-end reports may be submitted later under the limited circumstances outlined below by non-Local Education Agency (LEA) and LEA.
CSPP Contractor Revision Deadlines for Non-LEAs
Non-LEA contractors may submit revised year-end reports through August 20, 2024. Upon approval by EENFS, a preliminary contract closure calculation will be viewable in CPARIS based on the June year-end report, or a revised June year-end report, that is received by the August 20th deadline. Revised reports cannot be submitted after this date; contract closure and year-end reimbursement calculations will be based on the contractor’s audit.
CSPP Contractor Revision Deadlines for LEAs
LEA contractors may submit revised June year-end reports according to the deadlines below. Contract closure and year-end reimbursement calculations for an LEA are based on the June year-end report, so it is vital that information is complete and accurate. LEAs should submit a revised report, if necessary, to EENFS as soon as possible, but contractors have sixty (60) days from the due date for submission of the audit to submit a revised report to their EENFS Fiscal Analyst (FY 2023–24 Contract Terms and Conditions (CT&C)).
- A County Superintendent of Schools/School District audit is due on December 15 (EC Section 41020). The revised report deadline for FY 2023–24 is February 13, 2025.
- A Community College audit is due to CDE on December 31 (CT&C). The revised report deadline for FY 2023–24 is March 1, 2025.
Preschool Reserve Account Reporting
If a CSPP contractor has a Preschool Reserve Account, a Preschool Reserve Account Activity Report is required, regardless of whether the Preschool Reserve Account has a balance. A copy of the contractor’s general ledger report page(s) that reflects the cash balances maintained in the Reserve Account must be submitted via email to the assigned EENFS Fiscal Analyst by July 22, 2024.
To be considered acceptable, the Preschool Reserve Account Activity Reports must comply with the following:
- Verify the beginning balance displayed on the FY 2023–24 Preschool Reserve Account Activity Report is correct and matches the ending balance of the most recent FY 2022–23 Reserve Account Status Report provided by EENFS.
- Report interest earned on Preschool Reserve Account funds. The Preschool Reserve Account amounts must be kept in an interest-bearing account within the contractor’s early education fund. Preschool Reserve Account Activity Reports submitted to EENFS that indicate a balance with no interest reported will be deemed unacceptable.
- The general ledger must be submitted by email to the assigned EENFS Fiscal Analyst.
Contractors requesting transfers from a Preschool Reserve Account to a CSPP contract for expenses incurred in FY 2023–24 must report the transfer on the Transfer from Preschool Reserve Account line in the Revenue section of the June Year-End Enrollment, Attendance, and Fiscal Report. The Enrollment, Attendance, and Fiscal Report must be certified prior to the Preschool Reserve Account Activity Report; the transfer amount will be auto populated.
Establishing a Preschool Reserve Account
Contractors who do not currently have a Preschool Reserve Account and wish to open one can do so in CPARIS. The request to open a Reserve Account can be found in the Preschool Reserve/Establish Reserve Account submenu. Requests to open a Preschool Reserve Account must be received by July 22, 2024, to be established as of FY 2023–24. Requests received after that date will not be processed. Requests to establish a Preschool Reserve Account do not need to be made annually; contractors that established a Preschool Reserve Account in prior years do not need to establish a reserve account again in FY 2023–24.
For further information, please refer to the Preschool Reserve Account instructions in the CPARIS User Manual, which can be found at https://www.cde.ca.gov/fg/aa/cd/documents/cparisusermanual23.docx .
Closing a Preschool Reserve Account
Contractors who wish to close a Preschool Reserve Account may do so by completing the Request to Close Reserve Account in CPARIS. The request to close a Reserve Account can be found in the Preschool Reserve/Reserve Account Close Request submenu.
When a Preschool Reserve Account is closed, any balance currently held in the Preschool Reserve Account, and any interest accrued by the funds, must be returned to CDE. Contractors closing Preschool Reserve Accounts will be invoiced for the full balance. Requests to close a Reserve Account should be submitted on the same date the contractor’s June year-end Enrollment, Attendance, and Fiscal Reports are submitted, which are due July 22, 2024.
Audits and Investigations Divsion: Audited Attendance and Fiscal Reports Reminders and Changes
Please share the following information with your fiscal staff and independent auditor, e.g., Certified Public Accountant (CPA), who performs your annual audit that you submit to the CDE.
Pursuant to 5 CCR Section 17825(c), contractors that fail to produce or submit an acceptable audit within one year of the due date, as specified in 5 CCR Section 17814, may be billed for 100 percent of the preschool funding received by the contractor for that fiscal year.
Fiscal Year 2023–24 AUD Forms
CDE’s Audits and Investigations Division (A&I)’s resource page, which includes audit guidelines and Audited Attendance and Fiscal Reports (AUD forms) and Instructions for FY 2023–24, can be found at https://www.cde.ca.gov/fg/au/pm/.
Fiscal Year 2023–24 Electronic Submission Instructions
FY 2023–24 audit reports may be electronically submitted to CDE using the following information:
Website: <begin add>https://www3.cde.ca.gov/exfiles/index.aspx?pid=211<end add>
Project Code: AUDIT24
Password: UPaudit24
Audit reports that need to be submitted to the CDSS may be emailed to AuditsOffice@dss.ca.gov.
Reminders
The following audit requirements of the CDE Audit Guide, referenced by section number, are important to discuss with your CPA. The CDE Audit Guide can be found at https://www.cde.ca.gov/fg/au/pm/.
- Ensure that the audit engagement letter between the contractor and the CPA states that the audit will be performed in accordance with the CDE Audit Guide (see Section 160.C.2) and identifies the date that the final audit report must be submitted (due dates in Section 211).
- Except for contractors on conditional status, a CSPP contractor may be granted a one-time-only per year, 30 calendar-day extension of the audit due date, provided the inability of the contractor to submit the audit by the due date was beyond the fault and control of the contractor. The extension request due date and instructions for submission are specified in Section 212.
- Per Section 360, as of FY 2020–21 audit submissions, contractors are required to submit a quality review checklist along with their audit reports and include a supplemental schedule titled Notes to the Child Development Supplemental Information in the audit report. CDE will make the checklist available on its website at https://www.cde.ca.gov/fg/au/pm/ and by request at AuditSubmissions@cde.ca.gov.
- Section 310.A provides an overview of the AUD forms. Also see A&I’s Resources Page for AUD form instructions.
- Preparation of the Audited Preschool Reserve Account Activity Report (form AUD 9530‑A) is explained in Section 350. Detailed instructions for preparing the AUD 9530-A form are included in the AUD form instructions.
- The AUD forms and supplementary information are required for subcontracts, except for subcontractors that operate preschool programs for school districts (Section 345). The contractor is responsible for providing an audit report of its subcontractor(s) that includes the supplementary information detailed in Chapter 200, Exhibit A and the AUD forms for any subcontracts (Section 211.D).
- If start-up expenses (service level exemption) are reported on the AUD forms, the audit report must include a “Schedule of Reimbursable Start-up Expenses” (Section 320).
- Include in the audit report a “Combining Statement of Activities” (Section 315.B). Revenues reported on the “Combining Statement of Activities” must be traceable to individual CDE contracts in revenue sections 3 and 5 of the respective AUD form.
- If CDE reporting requirements differ from those of GAAP, e.g., for depreciation, a “Reconciliation of CDE and GAAP Expense Reporting” is required (Section 315.C).
- Cost allocation guidance is provided in Section 718.
Costs Disallowed in Early Education Audits
The following are examples of costs disallowed in audits of preschool programs. When costs are disallowed by CPAs or the A&I, the CDE will not reimburse those costs. Each example is followed by a bracketed citation to identify the applicable requirement in the CT&C for Preschool Programs. The CT&C can be found at: https://www.cde.ca.gov/fg/aa/cd/ctc2023.asp
- Payroll costs for salaries and benefits are disallowed when a contractor does not adequately support its claim for reimbursement, e.g., does not maintain payroll records that indicate the actual amount of time spent performing direct cost activities in each program per day for multi-funded employees (CT&C, Section VI.F).
- The following costs are disallowed, as they are specifically prohibited by the contract. Note, this is only a partial list (CT&C, Section V.G):
- Bad debts, excepting parent fees if collection attempts are adequately documented
- Amusement and entertainment
- Idle facilities for full-year programs, e.g., office or classroom used for storage
- Fines and penalties
- Bonuses
- Costs incurred outside the contract period, except for audit fees (CT&C, Section V.H)
- Costs are disallowed if they are not reasonable and necessary to the performance of the contract (CT&C, Section V.A), for example:
- Granite counter tops in kitchen and bathrooms
- Cellular telephones for employees’ spouses and children
- High-end office furnishings
- Depreciation is disallowed when claimed on: (a) assets purchased with public funds, (b) donated assets; or (c) idle or excess facilities (CT&C, Section III.D).
- When a contractor lacks prior written approval from the EED, costs are disallowed for:
- Renovation and repairs or equipment purchases in excess of the CT&C thresholds (CT&C, Section III.E)
- Subcontracts for direct early learning and care services (CT&C, Section IV.E)
- Rent is disallowed (CT&C, Section II.O):
- On property owned by the contractor (an expense may be claimed only as depreciation or use allowance)
- On property owned by affiliates, officers or other key personnel of the contractor or their families, unless the contractor obtains (and claims no more than) a fair market rental cost estimate from an independent appraiser licensed by the California Office of Real Estate Appraisers
- Claims for reimbursement are disallowed if there is insufficient documentation to support the claim, e.g., no paid invoice or receipt to support an expense; the contractor has the burden of proof. (CT&C, Section VI.F).
- Costs of advertising are disallowed when the advertisement is not necessary to meet the requirements of the Early Education contract (Title 2 Code of Federal Regulations, Section 200.421).
For additional information regarding the AUD forms or audit requirements, please contact the CDE A&I Division at 916-322-2288.
Additional Resources
The EENFS webpage contains valuable resources for contractors, including the Enrollment, Attendance, and Fiscal Reporting, and Reimbursement Procedures for Early Education Contractors, also known as the EENFS Fiscal Handbook. Supplemental fiscal guidance, such as contract-related updates, rate reform resources, a link to CPARIS, the CPARIS User Manual, and Frequently Asked Questions, and links to view past webinars, can also be found on the EENFS webpage.
CSPP contractors will continue to be informed of added content to this webpage by notification through the EED Email Distribution List Subscription. The subscription page for the EED email distribution list can be found at https://www.cde.ca.gov/sp/cd/ci/progspeclist.asp. The EENFS webpage can be found at https://www.cde.ca.gov/fg/aa/cd/. Additionally, MBs distributed by the EED throughout FY 2023–24 can be found at https://www.cde.ca.gov/sp/cd/ci/allmbs.asp. The MBs also contain fiscal directives, when applicable.
If you have questions or need clarification about any other topic covered in this letter, please contact your assigned EENFS Fiscal Analyst. The EENFS Fiscal Analyst directory can be found at https://www.cde.ca.gov/fg/aa/cd/faad.asp.
Sincerely,
Corey Khan, Staff Services Manager III
Early Education and Nutrition Fiscal Services
Fiscal and Administrative Services Division