Skip to main content
California Department of Education Logo

Design Bus/Parent Drop-off Conflict Example 8

This is a conceptual display of bus/parent drop-off conflict and the areas of concern being the crosswalk and parking conflict.

This is an Accessible Alternative Version of the conceptual design Bus Drop-off/Parent Drop-off Conflict Example 8 (PDF). The Adobe Acrobat Portable Document should be the preferred version for downloading.

A conceptual design for school site layout displaying a conflict with parent and bus drop-off. The area of concern with this illustration is the pedestrian driveway conflict, where a parking space requires a driver to back across the crosswalk or into a traffic lane. For the drop-off location relative to the school entrance, parents will try to drop-off at the entrance rather than driving onto the site fully, causing vehicles stacking into the street.

California Department of Education, School Facilities and Transportation Services Division. These are conceptual displays only and are intended to illustrate a specific Title 5 criterion. The California Department of Education will evaluate designs based on the unique site conditions and the educational program of a school.

Questions:   Diane Waters | dwaters@cde.ca.gov | 916-327-2884
Last Reviewed: Wednesday, May 28, 2025
Recently Posted in School Facilities
  • The Guide to Long-Range Facilities Master Plans (updated 10-Nov-2026)
    The Guide to Long-Range Facilities Master Plans (LRFMP) was revised in 2026, with updated guidance on master planning for local educational agencies and Proposition 2 requirements for school districts applying for School Facility Program Funding.
  • Key Components of a Facilities Master Plan (added 10-Nov-2026)
    The elements of a typical facilities master plan (FMP) and guidance on what to include, how to organize the information, and why it matters, from the Guide to Long-Range Facilities Master Plans.
  • Conclusion (added 10-Nov-2026)
    A summary on master plans as living documents that reflect thoughtful educational goals and future planning, from the Guide to Long-Range Facilities Master Plans.
  • Education Programs with Specialized Facility Needs (added 10-Nov-2026)
    The importance of including specialized facilities in facilities master plans to meet the needs of educational programs and students with disabilities, from the Guide to Long-Range Facilities Master Plans.
  • Additional Considerations and Planning the Future (added 10-Nov-2026)
    Integrating sustainability, safety, accessibility, and climate resiliency into every stage of facilities master planning, from the Guide to Long-Range Facilities Master Plans.

  • Appendix A (added 10-Nov-2026)
    A table of Facilities Master Plan Elements vs. Proposition 2 Requirements, from the Guide to Long-Range Facilities Master Plans.
  • Appendix B (added 10-Nov-2026)
    A summary of additional required elements per Proposition 2, from the Guide to Long- Range Facilities Master Plans.
  • Facilities Master Planning Resources (added 10-Nov-2026)
    Additional resources, facilities master plan (FMP) exemplars, and links to the Office of Public School Construction (OPSC) Guidelines for the Five-Year School Facilities Master Plan, from the Guide to Long-Range Facilities Master Plans.
  • Introduction (added 10-Nov-2026)
    An introduction of the Guide to Long-Range Facilities Master Plans.
  • Facilities Master Planning Process (added 10-Nov-2026)
    Best practices for launching a facilities master planning (FMP) effort, engaging stakeholders, and long-term planning, from the Guide to Long-Range Facilities Master Plans.