Bidding Quick Reference Chart


Bidding Thresholds and Procurement Methods Based on Project Types

Project Type Threshold Procurement Method Authority Notes

Public Works Construction (Districts not operating under California Uniform Public Construction Cost Accounting Act (CUPCCAA))

Over $15,000

Formal sealed bid*

Public Contract Code 20111(b) External link opens in new window or tab.

Definition of Public Construction Project External link opens in new window or tab.

Lowest responsible bidder; bidder security required
CUPCCAA Construction $0-$75,000 Force Account, Negotiated Contract, or Purchase Order

PCC Section 22032(a) External link opens in new window or tab.

Public Contract Code 22000-22045 External link opens in new window or tab.

CA State Controller's Office CUPCCAA Webpage External link opens in new window or tab.

Cost Accounting Policies and Procedures Manual - 2025 Edition External link opens in new window or tab. (PDF)
CUPCCAA Construction $75,001-$220,000 Informal Bid PCC 22032(b), or (c) External link opens in new window or tab.
CUPCCAA Construction Over $220,000 Formal Bid PCC Section 22032(c) External link opens in new window or tab.

Equipment, Materials, Supplies, Services, and Non-public-project Repairs***

Over $119,100 Formal bid or eligible alternative contract method

Public Contract Code 20111(a)(1) External link opens in new window or tab. **

Alternatives include piggyback, CMAS, cooperative contracts

CDE Bid Threshold Adjustment Letter 12-08-2025
Professional Services Any Amount Qualifications-Based Selection

Public Contract Code 20111(d) External link opens in new window or tab.
Verify applicable statute and district procedures

Architects/Engineers/Construction Management Any Amount Qualifications-Based Selection Government Code 4524-4529.5 External link opens in new window or tab.
Cooperative Contracts / Existing Master Agreements Varies Use an existing eligible cooperative or state contract Public Contract Code 20118 External link opens in new window or tab.
Verify district and County Office of Education restrictions

 

*The $15,000 threshold applies to contracts involving a public project, and bids must be submitted under sealed cover with bidder security. Lowest responsible bidder requirement: because the attached rules state that public project contracts must be awarded to the lowest responsible bidder or all bids rejected.

**PCC 20111 External link opens in new window or tab. applies to contracts over the statutory threshold and includes equipment, materials, supplies, and services other than construction services.

***Subject to district and county-specific restrictions.

Best Practices for All Bids

Public Works vs Maintenance:

First determine whether the work is a public project (construction) or maintenance. Maintenance work is not treated as a public project under PCC 22002 External link opens in new window or tab.. See PCC 20115 External link opens in new window or tab. for the definition of maintenance.

Bonds:

Public works projects of $25,000 or more require a payment bond before work begins. Performance bonds are recommended as a best practice.

The document cites Civil Code 9550 External link opens in new window or tab. for required payment bonds over $25,000 and recommends performance bonds.

Construction bids require bidder security:
Examples include cash, cashier’s check, certified check, or bidder’s bond.

Required bidder security applies to public project construction bids under PCC 20111(b) External link opens in new window or tab..

Recommended Outreach Practices:

  • The School District Website: Acts as a central information hub for interested parties.
  • Online Bidding Platforms: Using bidding services to reach a wider network of contractors.
  • Contractor Associations: Informing relevant associations to alert their members of upcoming opportunities.

Check Local Requirements:

Always verify specific policies with the individual school district and legal counsel, as they may have unique internal requirements beyond the legal minimums.

California Code Sections Relating to Local Government External link opens in new window or tab.

Final Takeaway

For school districts, the most important first step is determining whether the purchase is a public works construction project. If it is, the district must then determine whether it operates under CUPCCAA. Once the project cost is estimated, the appropriate procurement method becomes clear. Proper planning, accurate cost estimates, and adherence to statutory thresholds help districts remain compliant while delivering projects efficiently and responsibly.

General Authority: Public Contract Code 20110-20118.4 External link opens in new window or tab.

Questions:   School Facilities & Transportation Services Division | sftsd@cde.ca.gov | 916-322-2470
Last Reviewed: Tuesday, October 06, 2026
Recently Posted in School Facilities
  • The Guide to Long-Range Facilities Master Plans (updated 10-Nov-2026)
    The Guide to Long-Range Facilities Master Plans (LRFMP) was revised in 2026, with updated guidance on master planning for local educational agencies and Proposition 2 requirements for school districts applying for School Facility Program Funding.
  • Key Components of a Facilities Master Plan (added 10-Nov-2026)
    The elements of a typical facilities master plan (FMP) and guidance on what to include, how to organize the information, and why it matters, from the Guide to Long-Range Facilities Master Plans.
  • Conclusion (added 10-Nov-2026)
    A summary on master plans as living documents that reflect thoughtful educational goals and future planning, from the Guide to Long-Range Facilities Master Plans.
  • Education Programs with Specialized Facility Needs (added 10-Nov-2026)
    The importance of including specialized facilities in facilities master plans to meet the needs of educational programs and students with disabilities, from the Guide to Long-Range Facilities Master Plans.
  • Additional Considerations and Planning the Future (added 10-Nov-2026)
    Integrating sustainability, safety, accessibility, and climate resiliency into every stage of facilities master planning, from the Guide to Long-Range Facilities Master Plans.

  • Appendix A (added 10-Nov-2026)
    A table of Facilities Master Plan Elements vs. Proposition 2 Requirements, from the Guide to Long-Range Facilities Master Plans.
  • Appendix B (added 10-Nov-2026)
    A summary of additional required elements per Proposition 2, from the Guide to Long- Range Facilities Master Plans.
  • Facilities Master Planning Resources (added 10-Nov-2026)
    Additional resources, facilities master plan (FMP) exemplars, and links to the Office of Public School Construction (OPSC) Guidelines for the Five-Year School Facilities Master Plan, from the Guide to Long-Range Facilities Master Plans.
  • Introduction (added 10-Nov-2026)
    An introduction of the Guide to Long-Range Facilities Master Plans.
  • Facilities Master Planning Process (added 10-Nov-2026)
    Best practices for launching a facilities master planning (FMP) effort, engaging stakeholders, and long-term planning, from the Guide to Long-Range Facilities Master Plans.